Demand charges, time-of-use tariffs, peak load — commercial energy costs are complicated. We design solar, battery storage, and EV charging around how your business actually runs, installed by our own in-house team from start to finish.
Commercial energy costs are rarely just about the electricity rate — demand charges, time-of-use tariffs, and peak load all matter. We design around your actual business load pattern, not a one-size system, so the numbers work from day one.
We look at your actual usage pattern — not a generic package — so your system offsets real demand, not just a headline kW figure.
On-site storage for peak shaving, resilience during outages, and smoothing out the demand spikes that drive up your bill.
Charging infrastructure for staff and visitors today, built to scale as your business moves toward an electric fleet.
From September 2026, commercial battery storage gets a real incentive for the first time. From October, solar systems up to 1MW become eligible for a major cost reduction too. Together, they change the numbers on almost any commercial energy project.
Book a free site assessment — one of our engineers will look at your actual load and give you a real number, not a guess.