---
title: Ador Energy | Commercial Solar Rebate, SRES to 1MW
description: From September 2026, BESS4 and BESS5 open new NSW battery storage incentives for businesses and industry. Find out what your site qualifies for.
image: https://www.adorenergy.com.au/hubfs/Untitled%20design%20(3).png
---

[ADORENERGY](https://www.adorenergy.com.au/?hsLang=en-au)

Rebates

[NSW BESS RebateNew](https://www.adorenergy.com.au/nsw-bess-rebate) [Commercial PV RebateNew](https://www.adorenergy.com.au/commercial-pv-rebate?hsLang=en-au) [Home Energy Saver LoanNew](https://www.adorenergy.com.au/home-energy-saver-loan?hsLang=en-au)

Who We Serve

[Residential](https://www.adorenergy.com.au/residential?hsLang=en-au) [Commercial](https://www.adorenergy.com.au/commercial?hsLang=en-au) [Industrial](https://www.adorenergy.com.au/industrial?hsLang=en-au)

Partners

Solar Retailers EPCs Electrical Contractors Builders

[Energy Hub](https://www.adorenergy.com.au/ador-energy-blog?hsLang=en-au)

About

[Who We Are](https://www.adorenergy.com.au/about?hsLang=en-au) Our Projects [Contact](https://www.adorenergy.com.au/contact?hsLang=en-au)

[Contact us](https://www.adorenergy.com.au/contact?hsLang=en-au)

ADORENERGY

Rebates

[NSW BESS Rebate New](https://www.adorenergy.com.au/nsw-bess-rebate) [Commercial PV Rebate New](https://www.adorenergy.com.au/commercial-pv-rebate?hsLang=en-au) [Home Energy Saver Loan New](https://www.adorenergy.com.au/home-energy-saver-loan?hsLang=en-au)

Who We Serve

[Residential](https://www.adorenergy.com.au/residential?hsLang=en-au) [Commercial](https://www.adorenergy.com.au/commercial?hsLang=en-au) [Industrial](https://www.adorenergy.com.au/industrial?hsLang=en-au)

Partners

Solar Retailers EPCs Electrical Contractors Builders 

[Energy Hub](https://www.adorenergy.com.au/ador-energy-blog?hsLang=en-au)

About

[Who We Are](https://www.adorenergy.com.au/about?hsLang=en-au) Our Projects [Contact](https://www.adorenergy.com.au/contact?hsLang=en-au) 

[Contact us](https://www.adorenergy.com.au/contact?hsLang=en-au)

Commercial & Industrial Offer

# From September 2026, commercial batteries get a real incentive.

NSW Government Program

## Two new activities open the door to commercial-scale battery incentives.

Until now, the NSW Peak Demand Reduction Scheme didn't cover commercial-scale batteries. From 1 September 2026, two new activities — BESS4 and BESS5 — change that, covering battery installations from 20kWh right up to 30MWh of usable capacity. Apartment buildings get their own version, BESS3, launching the same day. And if you're simply connecting a battery to a Virtual Power Plant, the smaller BESS2 incentive is already available now. At current certificate prices, BESS4 and BESS5 typically represent a 20% to 50% discount off the upfront cost of a fully installed system.

## Key Facts

BESS3

Apartment buildings (4+ dwellings), 20kWh to 200kWh usable capacity, from 1 September 2026

BESS5

Commercial, industrial & community batteries, over 200kWh, up to 30MWh eligible — incentive calculated on the first 10MWh only

BESS4

Small/medium business batteries, 20kWh to 200kWh usable capacity, from 1 September 2026

Estimated Savings

New solar PV required alongside the battery for BESS4/BESS5, sized to at least 25% of the battery's usable capacity

BESS5 systems up to 30MWh are eligible to install, but the incentive is calculated on the first 10MWh only. Both BESS4 and BESS5 require new solar PV sized to at least 25% of the battery's usable capacity. BESS3 has its own separate requirements for apartment buildings. Figures based on current program rules, which remain subject to ongoing PDRS consultation and may change.

Which One Applies to You

## Most small-to-medium businesses fall under BESS4. Larger sites fall under BESS5.

The right activity depends on your battery's usable capacity, not your business size or industry — and if you manage an apartment building rather than a commercial site, BESS3 is the one that applies instead. We handle the full assessment: sizing your system, confirming which activity fits, and managing the certificate process from start to finish, so you get a clear number, not a guess.

Enquire now

## Find out what your site qualifies for.

Don't miss out — book a free assessment before September and we'll model your BESS eligibility and show you the real numbers.

[Book a Free Assessment](https://www.adorenergy.com.au/contact?hsLang=en-au)

ADORENERGY

Solar, battery storage and EV charging — for home, business and industry.

##### Solutions

[NSW BESS Rebate](https://www.adorenergy.com.au/nsw-bess-rebate)[Commercial PV Rebate](https://www.adorenergy.com.au/commercial?hsLang=en-au)Home Energy Saver Loan

##### Company

ProjectsEnergy Hub[About Ador](https://www.adorenergy.com.au/about?hsLang=en-au)[Contact](https://www.adorenergy.com.au/contact?hsLang=en-au)

##### Partners

Solar RetailersEPCsElectrical ContractorsBuilders

##### Residential

Residential SolarResidential BatteryEV Charging

© 2026 Ador Energy, part of Ador Engineering. Castle Hill, Sydney NSW